Qualify a failure before anyone opens a ticket, write a defect a developer can reproduce, and close it only on a new passing test.


Review

From the previous lesson: a test is skipped with the reason "flaky, to look at later". What does the report prove about the behaviour it covers?

A failure is not yet a defect

A failed run says the product and the expected result disagree. It does not yet say which one is wrong. Before anyone writes a defect, the failure is qualified:

The problem is in The evidence What follows
The product The expected result comes from a specification someone owns, and the product differs from it A defect, assigned to the team that fixes the product
The test The expected result was never specified, or is out of date, or the test checks a detail nobody required The test is fixed, and the reason recorded
The environment Connection refused, missing data, a service not started: the test never reached the product Fix the environment, rerun, keep both runs

There is a fourth case, rarer and important: the product does exactly what was specified, and the specification missed something. That is not a defect in the code. It is a gap, and it goes back to the product owner as a missing requirement, not to a developer as a bug.

Where is the problem in each failure?
K1 · a critical travel claim went to queue-travel; the routing table says queue-A
K2 · the test expects the field queue_id; the contract approved in July renamed it recommended_queue, which the card returns
K3 · the run stopped on "connection refused": the claims-system stub was not started on the test server

A defect someone can reproduce

A defect report is written for a developer who was not there. They must be able to see the problem without asking you anything. It has:

  • a title that says what happens, not what you feel: "Critical travel claim routed to queue-travel", not "Routing broken";
  • the steps, with the exact data: which claim, which product line, which urgency, which build, which environment;
  • the expected result, and its source: the routing table, version, section;
  • the observed result, exactly as it appeared, with the screenshot or the log line;
  • the severity: how bad it is for the people who use the product. Priority, how soon it must be fixed, is a separate field, and usually the product owner's call.

It does not contain the fix. Guessing at the cause in the report sends the developer in a direction before they have looked.

Closing it

A defect is closed on a new run that passes, on a build that contains the fix. Not on "fixed, trust me", and not on a test that was changed to pass. That run becomes a regression case, kept in the suite for good, so that the same defect cannot come back unnoticed.

Write one

In CAMP-03, case CT-02 failed: claim 7731, travel product line, urgency critical, build 2.3.0-142, test environment. The card says queue-travel. Write the defect.