Module 02 · Running a campaign · 10 min

The frame of a campaign

Before the first run: what is in scope and what is not, which requirements can be tested, the cases and their status, and when each level may start and stop.


Review

From module 01: where must a test case's expected result come from, and what do you write when nobody has decided it?

Why a frame first

A campaign is one round of testing on one version of the product: for a sprint, a release, a recette. Its results only mean something against what it set out to test. "Eighty per cent of the tests pass" says nothing until you know eighty per cent of what, and what was left out.

So the frame is written before the first run, and it has five parts.

1. The scope, in and out

What the campaign tests, at which level, and whether a person or a report proves it. And just as visibly, what it does not test, with the reason. An item out of scope is a limit of every report the campaign will produce. Hidden, it becomes a lie by omission.

2. The requirements

Each requirement has an importance, set by the product owner, and the case that tests it inherits it. Some requirements cannot be tested in this campaign: a response time under load, with no load environment. They are not dropped. They are listed as not testable, with the reason, and they stay in every report.

3. The cases, and their status

A case goes from draft to to approve to approved. Only approved cases are run. Approval is a person's decision that the case tests the right thing with the right expected result: it is the moment the "to confirm" from module 01 must have been answered.

4. The entry and exit criteria

Each level has a criterion to start and a criterion to finish, written before testing:

Level May start when Is finished when
Component The code builds; the criteria and the cases exist Every component test passes; every new rule has a test; no test skipped without a reason
Integration Component is finished; the other side is available at a known version Every integration test passes against those versions
System Integration is finished; the product is deployed at a known build, with its test data Every testable requirement has a passing test; no open defect of the blocking severity

An exit criterion is an approved value. "Ninety per cent of cases passing" is a decision, and if nobody has taken it, it stays to confirm, like any other.

5. The campaign

The approved cases it will run, on which build, in which environment. One campaign per round: the next sprint is a new campaign.

ClaimTriage, CAMP-03

The frame you will use for the rest of this module:

Requirement Importance
EX-01 Routing follows the routing table Very high
EX-02 An agent without the entitlement gets ENTITLEMENT_DENIED and no card Very high
EX-03 The card carries its four required fields High
EX-04 A description is accepted from 20 to 2,000 characters High
EX-05 A card is never lost when the claims system is down High
EX-06 Every refusal is written to the audit log Medium
EX-07 The card in under 3 seconds for 95% of requests, under load Not testable: no load environment

Out of scope: the quality of the generated summary (an AI evaluation, part 2 of this course), and accessibility (a dedicated audit is planned next quarter).

Planned: ten approved cases, CT-01 to CT-10, on build 2.3.0-142.

At the end of CAMP-03, a manager asks for "the percentage of passing tests" to put in a slide. Which parts of the frame must appear next to that number, and why?